Supplier quotes
Compare your suppliers' quotes on the same scope
Upload the PDFs as they arrive. ArquiFlow reads each quote and, when you compare them, lays them out item by item, with each one's total at the same scope. The verdict is a recommendation: the decision is still yours.
Drop the PDFs
Several quotes for the job at once, just as your suppliers send them.
ArquiFlow reads each quote
Supplier, trade, line items and total. It lets you know when each one is ready.
Compare on the same scope
An item-by-item table and each quote's total covering the same work. What one leaves out is estimated from another's price and marked as estimated.
You award it
The verdict is a recommendation. Accepting a quote is your call, and it is recorded.
Worked example
Example: three offers for the façade
For the «Façade refurbishment, 12 Calle Mayor», the studio has asked three firms for a price, which we will call A, B and C. Each has sent its offer as a PDF, in its own layout and with its own way of grouping items.
What goes in
The technical architect drops the three PDFs into the project's Supplier quotes. ArquiFlow reads each one and fills in the supplier, the trade, the items with their quantity and unit price, the document total and the validity. If the items do not add up to the printed total, it flags it rather than correcting it.
The six items the offers share are scaffolding, hacking off the render, repairing the reinforcement, rendering, painting and waste management. Offer B does not mention waste management, and offer C expressly excludes the scaffolding. With all three read, he chooses to compare them.
What ArquiFlow returns
The comparison lays the offers out item by item, before VAT, and works out each one's total at the same scope. What an offer leaves out is estimated with the highest price another offer gives for that item and marked as estimated, naming the supplier the price comes from.
| Offer | Coverage | Quoted | Estimated | Same-scope total |
|---|---|---|---|---|
| B | Covers 5 of 6 items (does not quote: waste management) | €16,900 | ≈ €1,200, A's price | €18,100 |
| A | Covers all 6 items | €18,400 | Nothing estimated | €18,400 |
| C | Covers 5 of 6 items (excludes: scaffolding) | €14,300 | ≈ €4,200, A's price | €18,500 |
Offer C is the lowest as it arrives, but without scaffolding. At the same scope it comes last. So the Recommended card points to B, “€300 cheaper for the same scope”, and suggests asking it to include waste management. Below it, the warning always appears: “This is advice, not a decision. Awarding a quote is a separate step you take yourself.”
Had an item been impossible to estimate because no other offer prices it, that offer's total would read “Not calculated”, never zero. The technical architect reviews the item-by-item table, talks to firm B and, if he accepts it, taps Accept quote and, if he likes, writes the reason, which stays in the decision history. An accepted offer ArquiFlow has read can later go into an estimate as a chapter with its items and prices.
An illustrative example: the project, the names and the figures are made up and match no real client, supplier or property.
Good to know
It reads what the supplier sends
Supplier, trade, line items and total come from the PDF. If the supplier is already on your list, the quote is linked to them; if not, they are added. A detail you had already written is never overwritten: it is kept as a suggestion.
The same scope for every quote
You compare two to eight quotes in an item-by-item table, before VAT, with each one's total at the same scope. What one is missing is estimated from the highest price the others give and marked as estimated. When it cannot be worked out, you see “Not calculated”, never a zero.
It recommends; it does not decide
The verdict explains why it recommends a quote and always comes with its caveats. Awarding is a separate step: you accept the quote yourself, and the decision is recorded in its history.
From the quote to the estimate
An accepted quote that ArquiFlow has read goes into your estimates as a chapter with its line items and prices, plus your profit.
Frequently asked questions
Does ArquiFlow choose the quote?
No. It tells you which one it recommends and why, next to the item-by-item table and each quote's total at the same scope. Accepting one is your step.
What if one quote leaves out something the others include?
That quote's card lists it as “Not quoted” or “Excluded”, with the price used and which supplier it comes from, and its same-scope total counts it at the highest price the others give, marked as estimated. When none of them prices it, you see “Not calculated”; it never counts it as zero.
What if a quote doesn't arrive as a PDF?
You can add it by hand with its total, with or without a file. It goes into the comparison with that total, with no item breakdown, and only quotes ArquiFlow has read can go into an estimate.