Technical architects and building surveyors
Site reports, estimates and inspections, for whoever runs the site
You record the visit and upload the photos: ArquiFlow writes up the acta — a site visit, health and safety, quality control, or an ITE, IEE or IITE report — with the photos described and placed, and leaves it ready for you to review and sign. In the same project you draft the estimate, compare your suppliers' quotes, receive the subcontractors' weekly reports and place incidents on the plan.
What you can do with ArquiFlow
AI estimates
You describe the job and ArquiFlow drafts the estimate from the accepted quotes and your own chapters. Every price says where it comes from, and your profit stays out of the client's PDF.
Supplier quotes
You upload suppliers' quotes as PDFs and ArquiFlow compares them: what each one includes, what it does not mention and what it excludes. The comparison recommends; the decision is yours.
Subcontractor reports
Each subcontractor fills in its weekly report from a link, with no account. You validate it and it goes into the project's weekly acta.
Site plans
You place the visit's observations and incidents on the plan. Replace the plan and each point stays on the version you marked it on.
Building inspection
ITE, IEE and IITE actas with each regime's own fields and every defect graded by building element. For an IITE, the indicative rating follows from what you graded.
Manolo, the AI assistant
You ask Manolo, the AI assistant, about the regulations in the documents you choose. Every answer cites its sources and takes you to the text.
Worked example
Example: from the site visit to the signed acta
On Thursday, the technical architect of the «Façade refurbishment, 12 Calle Mayor» makes his weekly visit with the site manager and the masonry firm's foreman. This is that visit's path through ArquiFlow.
What goes in
He creates a “Site report” acta in the project and records the visit on his phone while he walks the façade and comments on what he sees. He takes the photos on the same phone and, on the third-floor plan, places two observations and one incident with Add on the plan. Back at the studio he uploads the recording and the photos.
On the acta he enters the attendees — a role such as “site manager” is enough — and the visit details: arrival and departure time, weather, progress and next visit. Three trades have sent their weekly report; he validates two.
What ArquiFlow returns
ArquiFlow transcribes the recording, describes each photo saying only what can be seen, and drafts the acta. Each photo is placed beside the observation it shows; where that is unclear, it stays among the Unclassified photographs for the technician to assign. The table sums up what goes in and what comes out.
| What the technician brings | Where it appears in the acta |
|---|---|
| The visit recording | “Summary”, “Observations” and “Action items”, with owner and due date |
| The phone photos | Beside their observation and, numbered, in the “Photo register” |
| The points on the third-floor plan | “On the plan”, with markers 1, 2 and I1 |
| The two validated reports | “Trade breakdown”, with the trade, the lead and the work |
| The attendees and the visit details | “Attendees” and “Acta details” |
The technician reviews the draft, fixes one sentence and changes a photo's description. On tapping Issue, the acta gets its final number and its content can no longer be changed; the report he did not validate is left out. Incident I1 moves to the project's Incidents and tasks as Open, with its point on the plan.
He then signs the acta in the app and sends it as a PDF by email to the owners and the site manager. The studio signs; the recipients receive the PDF. The signature is a stroke drawn on screen, and the PDF says so. The same project holds the estimate, the suppliers' offers and the next acta, which will start the same way: recording the visit.
An illustrative example: the project, the names and the figures are made up and match no real client, supplier or property.
Good to know
From estimate to acta, in one project
An accepted quote that ArquiFlow has read can go into the estimate as a chapter with its line items and prices, and the incidents you place on the plan go into the project's incident list when you issue the acta.
Photos described and in place
You upload the visit's photos and ArquiFlow describes each one and places it beside the observation it belongs to. Before you issue the acta you can change a caption or move a photo.
Signed in the app, sent as a PDF
You sign the issued acta in the app and email it as a PDF to the owners and anyone else who needs it. The studio signs; the recipients receive the PDF.
An issued acta no longer changes
Once issued, the acta is closed: it cannot be edited or deleted. What the recipients receive is what you issued.
Frequently asked questions
Does it work for supervising the works on site?
Yes. ArquiFlow writes up site visit, meeting, health and safety and quality control actas, and in the same project you keep the estimate, the suppliers' quotes, the subcontractors' reports and the incidents. Everything is organised by client and project.
Does it handle the Catalan IITE?
Yes. On the acta you choose the regime — Catalan IITE, the IEE (building assessment report), municipal ITE or Euskadi ITE (Decreto 117/2018) — and it asks for that regime's fields. For an IITE you also see the indicative rating that follows under Decret 67/2015.
Does ArquiFlow hand the report to the authorities?
No. In ArquiFlow you write the acta, sign it and send it as a PDF. Taking it to the competent authority is up to the owners, and the Administration issues the certificate: the one the acta shows is indicative.